Construction Blogs

TOP-NOTCH CONSTRUCTION HOUSE REPAIR

Finally, Quality Construction at the Price You Can Afford!Roof, paint, plumbing, cabinets and airconditioning are the most common repairs that are done in your house.  For repair work, you need to put an extra effort to ensure that you can get the service of an experience ad very skilled worker. Failing to do so, the repair work might do more harm than good and will cost you a lot more money.Top-Notch Construction is staffed with experienced, professionals and technicians that know their job very well. They are trained in their field...

HOUSE RENOVATION IN THE PHILIPPINES

What is House Renovation?House renovation refers to altering or making changes to the existing building or structure in order to improve its appearance or to suit certain requirements of the homeowner. House renovation may includes minor improvement works such as painting or tiling works and major works such as house extension.Renovation may also include house restoration which is the process of bringing back the old house back to its useable state. This will include stripping down the existing house of its old or damage parts and replacing it with new...

HOUSE CONSTRUCTION in the PHILIPPINES

Building your dream houseBuilding a house in the Philippines is one of the biggest dream come true for lot of people. For many, houses are being constructed only once in a lifetime and therefore, everybody likes to make their own house construction plans in a systematic manner.It is best to hire the services of professionals like engineer or architect when designing your dream home. They are skilled in that field and will give you needed advice on space planning and practical cost saving techniques.House construction is also a bit tricky....

PREFABRICATED HOUSES AND BUILDINGS IN THE PHILIPPINES

What is a Prefabricated House?Prefabricated house is basically a type of houses fabricated in parts in a factory and deliver and assembled on site.  The completed structure is usually better in quality, lower in cost and completed in a very little duration.What are the Types of Prefabricated Buildings?There are three types of Prefabricated buildings based on their construction methods. The modular type, the panelized type and the manufactured housing.1. . Modular homes are constructed in the factory as modules or per room, complete with walls, floor and roof or ceiling with...

Philippine Contractors and Home Builders

Architects Construction Company Builders > Construction Articles > Philippine Contractors and Home BuildersSee Philippine Contractors and Home Builders here.Top-Notch Construction Corporation offers design services, construction services, construction management services. We also offers an array of prefabricated buildings for your needs. Top-Notch Construction also fabricates and supply Glass and Aluminum Doors and Windows and also fabricates and supply Modular Cabinets. ...

HOME DESIGNS

See Updated list of more than 100 sample Home designs and House plans and finished projects here.We are offering house and building design services nationwide anywhere in the Philippines. Particularly in the following areas; Metro Manila, Cavite, Laguna, Rizal, Batangas, Quezon, Rizal, Bulacan, Pampanga, Central Luzon, Davao city, Cebu city, Philippines. Top-Notch construction also offer prefabricated house models. Watch our for our promos and freebies. Visit our FREE ESTIMATE page for free quotation on your requirements. Contractor Metro Manila Cavite Rizal Laguna Bulacan Pampanga Batangas  ...

CONSTRUCTION MATERIALS

The National Building Code of the Philippines provide that “materials for building construction must have a certain quality and physical properties to be structurally sound”.The materials must be able to carry load or weight without changing shape permanently.Deformation of the materials may occur when load is applied, but must return to its original position when load is removed.If the material is not elastic and deformation is present in the structure after removal of load, repeated loading and unloading will eventually increase the deformation to the point where structure would become...

CONSTRUCTION SCHEDULING

With the advent of advanced technology, mechanical operations have stepped-up on the highly sophisticated management operations with the aid of computers. Construction projects scheduling of men, machine and purchasing activities strictly adhere to PERT/CPM program focused on the critical path method. Under this system, each separate operation required to complete a project were itemized including the time duration in relation with other works. By this means, the most critical item or work that may cause delay could be identified ad immediately acted upon by the construction manager.In planning, the logical...

CONSTRUCTION MANAGEMENT

What is Construction Management?Construction Management is the art and science of handling construction projects. The main aim of which is to deliver the project at the shortest time, the lowest cost possible and within or beyond the required quality requirements and specifications.Construction management involves identifying the deliverable or the objectives of the project, estimating the required resources and manpower, planning the strategies and methods of construction, monitoring and supervising the actual construction and turning-over the project to the client.One of the main tools of construction company in management is planning....

Reducing Construction Cost

The activity time for project constructions are normally estimated for some given level of resources. However, on several occasions, the length of the project time of activities, were reduced, by injecting additional resources.Project managers must have certain options at his command that will allow shortening of the time referred to as “Crashing Certain Activities” and the most obvious options is the use of additional funds to support additional personnel, have more efficient equipment and relax some work specifications.The goal in evaluating the time cost trade-off is to identify a plan...